Residential construction project
City: Zagreb
City: Donja Dubrava
LOCATION
The new project of a residential building designed as a reinforced concrete structure (earthquake resistant) is located in the Dubrava district, in the vicinity of the CITY CENTER EAST shopping center.
It is a project characterized by an urban character, modern architecture, and quality apartments adapted to a modern lifestyle.
The plot is surrounded by residential buildings, family houses and it is an absolutely quiet location with a lot of greenery. Modernly designed residential building through architectural optimization of space, achieves a perfect combination of elegance and practicality, and quality heating systems and excellent thermal insulation of the building guarantee low monthly living costs.
The building plot has a regular shape, and the area of the plot is 340 m2.
The building is designed to ultimately satisfy the "A" energy class.
STORAGE
The project foresees a total of 5 residential units and provides 5 parking spaces and 5 storage rooms.
Parking spaces are located on the lot as 5 outdoor parking spaces (VPM).
The apartments have the following structures (rooms):
· Ground floor: 2 x 2-room apartment (1 bedroom + living room)
· First floor: 2 x 3-room apartment (2 bedrooms + living room)
· Second floor: 1 x 4-room apartment (3 bedrooms + living room)
Vertical communication through the building is achieved by a staircase.
The highest quality materials and construction methods are used during construction and furnishing.
PARKING
- 5 outdoor parking spaces 12.50 m2, purchase is mandatory - price €7,800.00.
- The residential building has direct vehicular and pedestrian access
PRICES
PRICE OF APARTMENTS: €2,650.00-2.800,00/m2
A 25% deposit is required to reserve the apartment.
The prices of the available properties are expressed in EUR with 25% VAT included.
When buying an apartment, the buyer is exempt from paying real estate purchase tax in the amount of 3%.
SPECIAL NOTE
In case of advance payment of the entire amount, a one-time discount of 5% is granted.
IMMIGRATION
Planned start of works: 10/2022
Planned completion of works: 12/2023
Other information on request.
EUROVILLA
REAL ESTATE AGENCY
Zagreb
15 Gajeva Street
Radnička cesta 52 (Green Gold)
Horvaćanska cesta 160
Split
Mike Tripala Street 4
Rovinj
ACI Rovinj, Promenade of the Council of Europe