Residential construction project
City: Zagreb
LOCATION
The new project of a residential building designed as a reinforced concrete structure (anti-seismic), is located in the Dubrava district, near the CITY CENTER EAST shopping center.
It is a project characterized by an urban character, modern architecture, and quality apartments adapted to a modern lifestyle.
The plot is surrounded by residential buildings, and family houses and it is an absolutely quiet location with a lot of greenery. Modernly designed residential building through architectural optimization of space, achieves a perfect combination of elegance and practicality, and quality heating systems and excellent thermal insulation of the building guarantee low monthly living costs.
The building plot has a regular shape, and the area of the plot is 368 m2.
The building is designed to ultimately satisfy the "A" energy class.
STORAGE
The project foresees a total of 5 residential units and provides 5 parking spaces and 5 storage rooms.
Parking spaces are located on the lot as 5 outdoor parking spaces (VPM).
The apartments have the following structures (rooms):
· Ground floor: 2 x 2-room apartment (1 bedroom + living room)
· First floor: 1 x 2-room apartment, 1 x 3-room apartment (1 bedroom, 2 bedrooms + living room)
· Second floor: 1 x 4-room apartment (3 bedrooms + living room)
Vertical communication through the building is achieved by a staircase.
The highest quality materials and construction methods are used during construction and furnishing.
PARKING
- 5 outdoor parking spaces
- The residential building has vehicular and pedestrian access
PRICES
PRICE OF APARTMENTS: €2,550.00-2,800.00/m2
A 25% deposit is required to reserve the apartment.
The prices of available properties are expressed in EUR with 25% VAT included.
When buying an apartment, the buyer is exempt from paying real estate purchase tax in the amount of 3%.
SPECIAL NOTE
In case of advance payment of the entire amount, we grant a one-time discount of 5%.
IMMIGRATION
Planned start of work: 10/2022
Planned completion of works: 4/2024
Other information on request.
Do you want to visit this property?