Donja Dobra, production facility/sawmill with a silo and a series of buildings, located on a 17,210 m² plot.
The facility includes a production hall, drying room, boiler room, maintenance workshop, enclosed storage area, and an administrative building. Occupancy permits have been obtained. This modern construction, in semi-finished condition, allows for setting up spaces for employees, expanding production, and extending the product range to meet the growing demand for finished products. If the new owner desires, a collapsed building on-site can also be restored for production use.
A separate silo building is connected to the production hall for storing sawdust.
For production process needs, a 325 KW supply and network usage contract has been signed with HEP.
The Dobra River runs adjacent to the location, and the facility is situated in a forested area, with comparative advantages being the proximity to the highway, isolation from residential areas, and a fully equipped sale with all machinery and vehicles. The sawmill is operational, and maintenance of the facility is ongoing.
The published price does not include VAT.
Click on the map to make it dynamic
The calculation is only informative, and can not be used for any other purpose.
If for this listings lower price is posted on some other website then the same is applied to us.