Residential construction project
City: Zagreb
Neighbourhood: Donji Grad
Street: Šenonina ulica
Šenoina street, NEW CONSTRUCTION, modern detached building within a residential block with a total of 6 three-story apartments with associated roof terraces and outdoor parking lots, green construction with the latest materials and high-grade equipment for self-sustainable functioning of the building. Moving in summer 2023. Excellent microlocation in the very center of the city.
CONSTRUCTION
The reinforced-concrete foundation slab, the load-bearing reinforced-concrete cerclages and the 25 cm thick reinforced-concrete mezzanine slabs are calculated according to EC8 – the seismic resistance of the structure. Partition walls and ceilings of the apartments are made according to the Knauf system. The floor height is 290 cm.
HEATING AND COOLING
The apartments are heated using a condensing gas boiler (floor gas) in combination with low-energy floor heating. The apartments are air-conditioned using the SPLIT system. Management, i.e. regulation of heating and cooling in each separate room, as well as the built-in thermostat, and there is the possibility of said regulation via smart devices.
EQUIPMENT
Equipment from renowned domestic and European manufacturers is installed in the building and apartments, and customers who express interest in the early stages of the project have the option of choosing equipment and adapting the floor plan of the apartment to their needs in cooperation with our architects. Exterior carpentry in PVC and combined with aluminum shutters, guides and window frames, exceptional energy efficiency 98. Visual appearance and quality. It is equipped with anti-burglary shutters and mosquito nets with electric control as well as three-layer glass. All apartments are equipped with silent pipes, installation preparation for the possibility of installing an alarm.
All other information on request.
Do you want to visit this property?